Week #2 (June 15-21, 2007)
The demolition crew continues to remove bricks from the window frames to restore the windows to their previous size. Here is an artist's rendering of the building with the windows restored. This is a very time consuming process since the crew must be careful to protect the integrity of the structure.

On Monday, June 18th the greenhouse was removed and the large hole was filled in with gravel.

A large chain link fence has been constructed around McFadden Hall as a safety precaution. In addition, large orange removal shoots have been placed on two of the third floor windows leading to the dumpsters below.